Kitchen Extensions
The brief behind most extensions we are asked to price, and the one where drainage and services decide the layout.
The kitchen is the brief behind most extensions we are asked to price. It is also the one where the services under the floor decide the layout more than the architecture does, and where the room can be beautiful and still not work.
What people actually want
Not a bigger kitchen. A different relationship between the kitchen and everything else.
Almost nobody extends because they need more worktop. They extend because the kitchen is a separate room at the back of the house, the family is somewhere else, and whoever is cooking is on their own with a wall between them and everyone they live with.
What solves that is not floor area, it is removing the wall. The extension provides the space for the room to become a kitchen, a dining table and a sitting area at once, and the structural opening into the existing house is what makes the whole ground floor read as one place rather than three.
That distinction matters because it changes what you should spend money on. A modest extension with a wide, properly formed opening into the existing rooms is a better house than a large extension reached through a doorway. If the budget is tight, the opening is not the place to save.
Where the services are
The single biggest constraint on a kitchen extension, and the one nobody looks at before drawing the layout.
A kitchen is the most serviced room in a house. It needs a foul drain for the sink and the dishwasher, a cold and hot supply, a gas run if you are cooking on gas, substantial electrical capacity, and extract ventilation to the outside. Where those things currently are, and where they can reasonably go, constrains the layout far more than most people expect.
Drainage is the one that decides things. Waste needs a fall to reach the existing drain, and the further the sink moves from the current soil stack or gully, the more fall you need and the fewer places the pipe can run. In a new extension with a solid floor, that fall has to be designed into the slab and the drainage before the concrete goes in. Deciding where the sink is going after the floor is down is expensive.
Where the extension crosses or comes within three metres of a public sewer, you need a build over agreement from Anglian Water. That is a separate application on its own timescale, it can require a CCTV survey, and it may require the foundation to bridge over the run rather than load it. We lift the manhole covers at survey stage, because twenty minutes with a torch is the cheapest twenty minutes on the whole job.
Extraction is the second. A recirculating hood in a room where people actually cook is a compromise, and in a highly glazed open plan space it is a bad one, because cooking smells stay in the fabric of the room. Ducting to an outside wall wants to be short and straight, and where the hob sits on an island in the middle of a new floor, that duct has to run in the slab or in the ceiling. Again, before the concrete.
Electrics. An open plan kitchen diner commonly needs a dedicated circuit or two more than the existing consumer unit has spare ways for. That is not a difficult job, but it is a cost, and on older Colchester housing the existing board is sometimes at the end of its life anyway.
Will you need planning permission?
Four questions, an honest answer, and nothing sent anywhere. This runs entirely in your browser.
What are you extending?
Permitted development rights for extensions apply to houses. Flats and maisonettes are a different route entirely.
Is the property listed?
Listed building consent is a separate decision from planning permission, and work without it is a criminal offence rather than a planning irregularity.
Has the house been extended before?
Depth is measured from the ORIGINAL rear wall, so a previous owner's extension has already used part of your allowance. This catches almost everybody.
Is it in a conservation area?
Colchester has a number of them, including the historic core, the Dutch Quarter, part of Lexden and several village centres. The boundaries rarely follow the roads you would expect.
Answer the four questions for an indication
Whatever the answer, Building Regulations approval is always needed. We check the planning history, the designation and the deeds on your address before anyone draws anything, because it decides the design rather than the other way round.
This is an indication based on four questions, not advice on your property. Planning rules change and the position depends on your specific address, its planning history and its designation.
The structural opening into the house
The bit that turns two rooms into one, and the bit that has to be calculated.
Removing the rear wall of the house is the structural event of a kitchen extension. That wall is carrying floor joists and often the roof, and the load has to go into a steel beam, the beam into padstones, and the padstones onto masonry capable of taking a concentrated point load it was never designed for.
The engineer sizes all three. Where the masonry below a bearing is not adequate, the load has to be taken down to foundation level, which sometimes means a pier or a new pad inside the existing footprint.
Everybody wants the widest possible opening with the slimmest possible beam. Beam depth is a function of span and load and there is no negotiating with it. On a wide span you can sometimes hide a deeper steel within the floor zone above, or use two beams, or change the structural arrangement. What you cannot do is ask for a smaller steel.
The related decision is whether to keep a downstand. A beam expressed as a shallow downstand across the opening is often the honest answer on a wide span, and it reads as a deliberate threshold between the old house and the new room rather than as a compromise. Trying to hide a large steel entirely can push the floor structure around in ways that cost more than the visual gain is worth.
Light, and the room you end up with
More glass is not more light, and it is definitely not a better room.
Part L limits the total area of windows, doors and rooflights in an extension to a proportion of its floor area, with an allowance for the openings you are covering over. You can exceed it, but you then have to compensate with better insulation or better glazing and demonstrate the extension performs as well overall. That is a design decision with a cost attached, not a free choice.
Overheating is the one nobody regulates for you here. Approved Document O covers it for new dwellings and does not reach an extension to an existing house, so there is no backstop, and a kitchen is the worst room to get it wrong in because you are adding an oven and a hob to a highly glazed space. A wall of south or west facing bifolds under a flat roof will be unusable on a July afternoon unless something has been done: solar control glazing, an overhang, and openable area positioned so air genuinely crosses the room.
Orientation should drive the design. A north facing rear elevation takes as much glass as you can justify because the light is even and it never overheats. South and west facing ones want less glass at the end and more light from above, because rooflights set back from the glazed wall bring daylight into the middle of the plan where the island and the table actually are.
The most common regret we are asked to fix is the dark middle room. Extend across the full width of a terrace or a narrow semi and the old middle room loses its only window and becomes a corridor between the front room and the new one. That is entirely avoidable at drawing stage with a light well, a set back or rooflights over the line of the old external wall. It is not avoidable afterwards.
Want this checked on your actual address?
Planning history, designation and deeds. We look at all three before anyone draws anything, and it costs you nothing.
Layout, and the things worth deciding early
The kitchen designer usually arrives too late to influence the things that matter.
Kitchen companies design beautifully within the room they are given. The decisions that determine whether the room works were made months earlier, when the drainage, the extract route, the electrical capacity and the position of the structural opening were fixed.
Worth deciding before the slab goes down: where the sink is, whether there is an island and whether it carries a hob or a sink, where the extract duct runs, whether there is underfloor heating, and where the doors to the garden are relative to the working area. An island with a hob in the middle of a room with no ducted extract is a decision made by default rather than on purpose.
Underfloor heating suits a kitchen extension particularly well. The floor is being built from scratch anyway, and it frees the wall space that a radiator would otherwise take in a room where every wall is either glass or units. It is decided before the slab, not after.
The other early decision is the threshold to the garden. A level threshold at the doors is achievable and it transforms how the room is used in summer, but it has drainage implications that have to be designed in: a channel drain and a properly detailed upstand, not an afterthought.
Floors, levels and thresholds
The floor is poured once and lived on for thirty years. It is worth thinking about.
A new extension has a new floor, and matching its finished level to the existing house is a decision made at slab stage, not at flooring stage. Get it wrong and you have a step between the old kitchen and the new room, which on an open plan ground floor is both a trip hazard and a permanent reminder that the space is two rooms pretending to be one.
The build up matters. Under the slab goes a compacted sub base, a damp proof membrane, then insulation, then the concrete. If underfloor heating is going in, the pipes sit in or on the screed above that. Every one of those layers has a thickness, and they add up to more than people expect. Working backwards from the finished floor level of the existing house, through the flooring you intend to lay, is the only way the levels come out right.
Existing houses are rarely level anyway. A Victorian terrace floor can fall twenty or thirty millimetres across a room. The new slab is poured flat, so the junction has to be resolved somewhere, and it is better resolved deliberately than discovered by a floor fitter.
Level thresholds to the garden are achievable and they genuinely change how the room is used. They also need designing: a channel drain outside the doors, a properly detailed upstand and damp proof course, and a drainage route for the channel. Done properly they are excellent. Done as an afterthought they are the most reliable way to get water into a new floor.
The flooring choice interacts with heating. Large format porcelain and engineered oak both work over underfloor heating. Solid timber is more temperamental. Decide the flooring before the screed goes down, because the depth changes.
The same wall, before and after
Drag to reveal. A real job in the Colchester area, photographed as it went. No staging and no borrowed images.
During
Finished
Islands, peninsulas and where the utility goes
The layout questions that have structural consequences.
An island is the default request and it is not always the right answer. It needs roughly a metre of clear space on every side to work, which means a room around 3.6 metres wide before you have an island anybody can walk past while somebody else opens the dishwasher. In a narrower room a peninsula does the same job with less circulation space and reads as less cramped.
If the island carries the sink, the waste and supply run in the slab, and that is decided before the concrete. If it carries the hob, you need either a ducted downdraft extractor or a ceiling extract above it, and both need a route designed in. If it carries neither, it is a worktop and a breakfast bar, which is a perfectly good answer and much simpler.
The utility question is worth raising early. Moving the washing machine and the boiler out of the kitchen is one of the most satisfying things an extension can do, and it needs a home: a section of the extension, a repurposed part of the existing house, or a lean-to off the side. It also needs drainage and, if the boiler moves, a flue route that satisfies the manufacturer’s clearances. A utility added as an afterthought at first fix is a compromise; designed in from the start it costs very little extra.
Storage is the thing people regret undersizing. An open plan kitchen diner has fewer walls available for tall units than the room it replaced, because so much of the perimeter is glass or opening. Counting the actual linear metres of usable wall at drawing stage, rather than after the glazing is ordered, avoids the most common disappointment with these rooms.
Building Regulations for a kitchen extension
Separate from planning, and a kitchen engages more of them than most rooms.
Part A for structure and the beam over the opening. Part C for damp proofing, the damp proof membrane under the slab and cavity trays where the new roof abuts the existing wall. Part F for ventilation, which in a kitchen means a specified extract rate. Part H for drainage, including anything that happens near an existing manhole. Part K for glazing and any level change. Part L for insulation and glazed area.
Electrical work in a kitchen is notifiable, and it has to be certified by a competent person and included in the completion paperwork. Gas work must be carried out by a Gas Safe registered engineer, which is a third party we bring in rather than something we do ourselves.
We use a full plans submission on anything involving a structural opening. The drawings and calculations are checked before work starts and you get a decision notice, which removes almost all the risk of an expensive disagreement halfway through. We notify Colchester City Council Building Control and manage the inspections through to your completion certificate.
Five things you can check yourself.
Trust on a building job should be verifiable, not asserted. Every one of these can be confirmed without taking our word for it.
-
01
Real company
Essex Probuild Ltd, company 15979928, registered in West Bergholt. Checkable on Companies House in a minute.
-
02
Real cover
£2m public liability cover in place. Evidence available on request rather than a badge on a website.
-
03
Real reviews
4.6 out of 5 on Google from 10 reviews, shown as they were left. We do not curate them.
-
04
Real photographs
Every project image on this site is a job we built. No stock, and no fabricated before shots.
-
05
Real accountability
We notify Colchester City Council Building Control and manage the inspections through to your completion certificate.
What a kitchen extension costs
Two numbers, and people routinely conflate them.
There is the cost of the extension, and there is the cost of the kitchen. They are separate, they are both substantial, and a builder’s quotation almost never includes the second.
The building work, indicative and current at the review date below: a single storey kitchen extension on reasonable ground with decent access typically runs £2,200 to £3,000 per square metre for the shell and a standard finish. On a 20 square metre extension that is roughly £44,000 to £60,000. Deep foundations, difficult access, wide structural openings and extensive glazing push above that.
That includes groundworks and foundations, drainage connections and alterations, structure and the steel, external walls and insulation, roof, windows and external doors, plastering, first and second fix carpentry, electrics and plumbing to a standard specification, and making good.
It excludes, and you should budget separately for: VAT, the kitchen units, worktops and appliances, flooring, decoration, professional fees for drawings and structural calculations, planning and Building Control fees, party wall surveyor fees where a neighbour dissents, and service diversions.
The kitchen itself is a genuinely open ended number. A well made mid range kitchen with quartz worktops and decent appliances for a room of this size is commonly £15,000 to £30,000 installed. It is entirely possible to spend three times that and entirely possible to spend half. Decide the rough figure early, because it affects how much of the total budget is available for the building.
How long it takes
And how long you are actually without a kitchen.
The front end is permissions. Most single storey rear kitchen extensions fall under permitted development, in which case there is no application, though we would still apply for a Lawful Development Certificate. Where a full application is needed the statutory determination period is eight weeks from validation. Building Regulations approval runs alongside, and party wall notices where they apply run one or two months.
On site, a straightforward single storey kitchen extension is commonly ten to sixteen weeks from breaking ground to completion, longer where foundations are deep or piled.
The question everybody actually wants answered is how long the kitchen is out of action. The extension is built outside the existing wall, so for most of the programme the old kitchen keeps working. The period without one starts when the rear wall comes out and ends when the new kitchen is installed and connected, which is typically three to five weeks. We tell you that figure before you commit, and we plan a temporary arrangement with you rather than leaving you to discover the problem.
What might it cost?
A realistic range rather than a single number, with what it excludes shown as prominently as what it includes.
£44k to £60k
- VAT
- Kitchen and appliances
- Flooring
- Decoration
- Drawings and calculations
- Planning and Building Control fees
- Party wall surveyor
- Service diversions
Indicative only. The biggest variable around Colchester is foundation depth, because most of the ground is shrinkable clay and mature trees are common. We price the job after seeing it.
Get a real price
Heating an open plan kitchen
A room that is half glass and open to the rest of the house behaves differently to the kitchen it replaced.
The old kitchen was a small room with a door and one radiator. The new one is a large volume with a large area of glazing, open to the hall or the living room, and it needs thinking about at both ends of the year.
Underfloor heating is the usual answer and it suits these rooms well. It frees the wall space a radiator would take in a room where the walls are units and glass, it heats a large floor plate evenly, and it is comfortable underfoot on a tiled floor. It is slower to respond than a radiator, which matters less in a room that is occupied for long stretches. It goes in before the screed, so it is decided early or not at all.
The system needs zoning. An open plan kitchen diner on the same zone as the rest of the ground floor will be either too warm or too cold, because it has a completely different heat loss profile to a small front room. A separate zone with its own thermostat is a small cost at first fix and the difference between a room that is comfortable and one that is fought with.
Check what the extension does to the boiler. Adding twenty or thirty square metres of heated space, some of it with a large glazed area, increases the load. On an older system that is worth a proper assessment rather than an assumption, and replacing or upgrading while the walls are open is considerably cheaper than afterwards.
At the other end of the year, overheating is the more common complaint in these rooms. Cooking adds heat, glazing adds heat, and a flat roof over a south facing wall of doors will make the space unusable on a hot afternoon without solar control glazing and cross ventilation designed in. An opening rooflight on the opposite side of the room from the doors is the cheapest and most effective thing you can do, because it lets hot air out at the top while cool air comes in low.
What we are asked to put right
The recurring failures on kitchen extensions specifically.
Drainage run designed after the slab, so the sink ended up where the pipe could reach rather than where the room wanted it. Recirculating extract over an island because no duct route was designed, leaving a room that smells of last night. Foundations too shallow for the clay, cracking at the junction with the house in the second summer. Cavity trays omitted where the new roof meets the existing wall, so water tracks through above the junction. A manhole built over with no access. Insufficient electrical capacity discovered at second fix. And the dark middle room, which is not a defect at all, just a design nobody thought about.
None of these are exotic and all of them are cheaper to avoid than to fix.
Get a real number, not a range.
We come out, look at the ground, the access and the structure, and price the job we have actually seen. The survey and the quotation are free.
Questions we get asked
Do I need planning permission?
Usually not for a single storey rear kitchen extension within the permitted development limits, but depth is measured from the original rear wall as the house was first built, so a previous owner’s extension counts against your allowance. Flats, listed buildings, conservation areas and estate covenants all change the answer. We check the planning history, the designation and the deeds first.
Should I get the kitchen designed before or after?
Have a conversation with a kitchen designer early, before the drawings are finalised, but do not order anything until the structure and the drainage are fixed. The early conversation influences the things that matter. The order comes later.
Can I use my existing appliances?
Usually, though check the dimensions against the new layout before assuming. An integrated appliance from a previous kitchen frequently does not fit a new carcass without modification.
Bifolds or sliders?
Sliders give you more glass and less frame, and they look better closed, which is how they spend most of the year in this country. Bifolds open the whole wall, which is genuinely lovely for the handful of weeks it is warm enough to want to. On a narrower opening sliders usually win. It is a preference rather than a right answer, and the cost difference at a given specification is smaller than people expect.
Which houses in Colchester suit which approach
The housing stock decides the shape of the kitchen extension more than taste does.
Victorian and Edwardian terraces, through New Town and the streets off Maldon Road, have a rear outrigger with a narrow alley beside it. The kitchen is usually in the outrigger, dark and only a couple of metres wide. The answer here is nearly always a side return: build out into that alley, take out the outrigger’s side wall, and the kitchen becomes the full width of the plot. Light comes from a run of rooflights along the boundary, because a boundary wall a metre away gives you nothing through a vertical window. Access is the cost driver, since everything comes through the house.
Interwar and 1930s semis, which is most of Lexden, Prettygate and older Shrub End, have side access and a decent garden depth. A single storey rear extension has room to work without swallowing the garden, and the side gate makes the build materially cheaper. These houses usually have a separate dining room, so the opportunity is to take out two walls rather than one and get a genuinely large open plan space. Watch the middle room: extending the full width leaves it without a window.
Post-war and 1960s housing around Greenstead, Monkwick and Old Heath has generous plots and simple rectangular footprints, detached and semi detached alike. Structurally the easiest of the lot, and there is often room to go both back and sideways, which gives you an L shaped kitchen and dining space with light from two directions.
Estate housing from the 1980s onwards, across Stanway, Myland and Highwoods, is simple to build on but the plots are tight and the boundaries close. The constraint is rarely structural and frequently legal: restrictive covenants on the title, or a management company whose consent is needed, and neither of those is something the council checks. We look at the deeds early on these.
Village property around Dedham, Boxted and Layer de la Haye brings conservation areas and older construction, sometimes with no meaningful foundation under the existing rear wall at all. The design conversation is longer and the answer is usually a more considered one, but the results in these houses are the best on our patch.







Fig. 01
What actually happens, in order
Three of these eight stages happen before anybody digs anything. Get the order wrong and you pay to redo work.
-
Survey
We look at the ground, the trees, the access, the existing structure and where the drains actually run.
-
Drawings
A technician produces existing and proposed plans and elevations to a standard the council will accept.
-
Permissions
Permitted development, prior approval or a full application. We submit it and handle the correspondence.
-
Structure
The engineer calculates the beams, the padstones and the foundation depth for your ground.
-
Groundworks
Dig, concrete and drainage. The messiest phase and the one that decides whether the rest stands still.
-
Structure up
Walls, steel into the opening, roof on, windows and doors in. The day the back wall comes out is planned with you.
-
Fit out
First fix, plaster, second fix. From here it stops being a building site and starts being a room.
-
Certificate
Final inspection and your Building Control completion certificate. Keep it with the deeds.
How we do it
One contract, one contact, and the paperwork is our job.
Our team has 25+ years in the trade and comes out. The survey looks at the ground, the access, the existing structure, the drain runs and where the services currently are, because on a kitchen those decide more of the design than anything else.
Most people who call us already have drawings and permission and want a builder to price the work and build it. That is the ordinary job here, and we are glad to work to somebody else’s plans. Where the drawings do not exist yet, we bring in the technician who draws it and the structural engineer who calculates the opening, we manage the planning route, we notify Colchester City Council Building Control and we handle the inspections. We work as main contractor and we can either fit the kitchen or work alongside whoever you have chosen to supply it.
We carry £2m public liability cover and everything is built to current Building Regulations. We notify Building Control, arrange the inspections and see the job through to the point where they issue your completion certificate. We are based in West Bergholt and cover Colchester and around thirty miles. The survey and the quotation cost nothing.
Last reviewed August 2026. Planning rules and Building Regulations change, and your property may differ, so treat this as a guide rather than advice on your specific job.